1. To facilitate the construction of the road tunnel as part
of the Woodsville Interchange upgrading, the current Electronic Road Pricing (ERP)
gantry at Bendemeer Road will be temporarily relocated about 100 metres further
down the road until end 2011, when upgrading works for the Woodsville
Interchange are expected to be completed. Thereafter, the relocated ERP gantry
at Bendemeer Road will be shifted back to its current location.
2. The installation of the new gantry will start from Monday,
24 November 2008 onwards and is expected to be completed in December 2008. When
the new gantry is being installed, motorists will see two separate ERP gantries
along Bendemeer Road. However, the new gantry will not be operational until the
existing gantry is decommissioned.
3. The switch over of the ERP gantry operation will be carried
out in early February 2009, when the construction of the road tunnel along
Bendemeer Road will require the removal of the existing gantry along Bendemeer
Road.
4. After the switch over, the re-located ERP gantry will
operate for the entire period while construction works for the Woodsville
Interchange upgrading project are ongoing.
5. During this period, motorists joining Bendemeer Road from
the slip road off PIE (Tuas) will pass through two ERP gantries – the existing
ERP gantry along the slip road off PIE (Tuas) and the re-located ERP gantry
along Bendemeer Road. However, the existing ERP gantry along the slip road off
PIE (Tuas) will not be operational during this period. Hence, motorists will
only be charged as they pass the relocated ERP gantry along Bendemeer Road.
6. Please refer to the attached
map for more details on the
location of the gantries.
7. The relocated ERP gantry will have the same ERP P rates and
operating hours as the current Bendemeer Road ERP gantry. Information signboards
will be displayed at key approaches leading to the Bendemeer Road gantry to
inform motorists of the relocation of the gantry.
8. The upgrading works for the Woodsville Interchange are
expected to be completed in end 2011. The relocated ERP gantry at Bendemeer Road
will then be shifted back to its current location. The ERP gantry along the slip
road off PIE (Tuas) will also revert back to normal operation, and like today
will have the same ERP rates as the gantry along PIE (Tuas) near Kallang Bahru.
About the Woodsville Interchange Upgrading Project
9. The Woodsville Interchange is located at the intersection
of Serangoon Road, Upper Serangoon Road, MacPherson Road and Bendemeer Road.
Serangoon Road and Upper Serangoon Road are two major arterial roads linking the
city with the Serangoon corridor and the northeast sector.
10. Upon expected completion of the project in end 2011, the
Woodsville Interchange comprising three road tunnels and a flyover, will
seamlessly connect the four key arterial roads connecting the northeast sector
to the city.
Location Map
|