31 January 2012
Red-Amber-Green arrow signal deployment at selected junctions
27 January 2012
LTA addressing improvements to MRT system now
20 January 2012
Roadworks information available on One.Motoring website
31 December 2011
Expect more color and graphics with expanded Emas
10 December 2011
Farrer Park is representative of the rich history of the area
5 December 2011
Sheltered walkway to bus stop will be ready next year
3 December 2011
Besides trains, more measures to spread commuter loads
2 December 2011
NSE's entry, exit points to bring people to the city
30 November 2011
Pedestrians' safety ensured, more lifts soon at bridges
24 November 2011
Options available at Serangoon MRT
17 November 2011
Owners of commercial vehicles who use them for personal use are liable to a fine or imprisonment
2 November 2011
Foldable bicycles allowed during off-peak hours
29 October 2011
Heavy vehicles were in queue, not illegally parked
27 October 2011
Developers can provide parking lots above minimum requirement
22 October 2011
LTA lists alternatives to London cabs
21 October 2011
How to avoid flight of stairs at Serangoon station
15 October 2011
LTA to look into feasibility of doing away with road-tax disc
14 October 2011
Tap card at the exit reader to ensure the correct fare is deducted
13 October 2011
Regular action against illegal car modifications
8 October 2011
We have retrofitted older stations with barrier-free facilities
3 October 2011
No impact on greenery in Arcadia Road
27 September 2011
Building roads only one part of urban transportation solution
23 September 2011
Will reduce disturbance to the public
21 September 2011
LTA to build lifts at overhead bridges
12 September 2011
Ongoing effot to raise taxi service standards
9 September 2011
LTA will take strict action against errant OPC drivers
9 September 2011
Round-the-clock traffic lights at Newton Circus
2 September 2011
Night repair was an emergency
31 August 2011
Low-noise equipment being used for MRT works
16 August 2011
Cross-border services are allowed only one stopping point
12 August 2011
Contractor to face action by LTA
8 August 2011
Grace period provided for parents picking up kids
6 August 2011
Road dividers necessary for pedestrians
6 August 2011
Grace period is provided for parents
28 July 2011
Railing at Clementi Mall bus stop shortened
13 July 2011
Community approach to parking needs
11 July 2011
Work on to widen Kranji Road junction
30 June 2011
Jurong East platform to see more usage from December
30 June 2011
LTA to paint guide lines for turning traffic
29 June 2011
Multi-agency study on noise under way
22 June 2011
Illegal ads removed
11 June 2011
Will build a centre road divider
10 June 2011
Lane-for-lane replacement for major road works
8 June 2011
Bus services added, amended to meet needs
4 June 2011
Why speed limit is 50kmh on Orchard Boulevard
30 May 2011
Traffic signals optimise green time for all users
22 May 2011
Why parking restriction is necessary for roads
27 April 2011
Green Man Plus scheme at 500 more crossings
21 April 2011
Cat-eye markers used at some locations
13 April 2011
Implementation of screen doors are being expedited
9 April 2011
Parking rights are granted by LTA
1 April 2011
Regular checks on illegal parking
26 March 2011
Netting has been removed
26 March 2011
Working with residents on estate's parking issues
24 March 2011
Pavement repairs starting
18 March 2011
Access road - Joint effort by agencies to minimise environmental impact
16 March 2011
LTA working with agencies to reduce environment impact
16 March 2011
Bridge contractors reminded about warning signs
25 February 2011
Margaret Drive to be more pedestrian-friendly
19 February 2011
A tap is all seniors need for more crossing time
18 February 2011
Traffic lights respond to changing conditions
17 February 2011
Building of Sports Hub: LTA tracking traffic flow
24 January 2011
More signboards planned for better route decisions
21 January 2011
Fare refund amount correct
21 January 2011
Tan Kah Kee topped public poll for station's name
10 January 2011
Excavation done, so temporary viaduct closed
8 January 2011
Enough ways to pay for using off-peak car
1 January 2011
Correct fare deduction
27 December 2010
How MRT stations got their names
20 December 2010
No bus fare discrepancy
8 December 2010
LTA will explore electronic road tax renewal reminders
4 December 2010
'Give way' scheme not suitable for all bus bays
1 December 2010
How road diversions affect fares
29 November 2010
Sorry, response process tweaked to make it faster
26 November 2010
Change in taxi stand status was communicated to all taxi companies
25 November 2010
LTA acting against dealer, helping police
12 November 2010
Pedestrian walkway will be completed by December
28 October 2010
Why there's an AYE bottleneck
27 October 2010
Why KPE speed limit is capped at 70kmh
20 October 2010
LTA will crack down on illegal parking
19 October 2010
Illegal parking : Members of the public can call or e-mail us
25 September 2010
Rain shelters have doubled since 2008
18 September 2010
Outram station will get restroom upgrade
12 September 2010
Premium, parallel bus services are two separate scheme
28 August 2010
Passport omission
20 August 2010
Refunds made on 80 claims of distance errors
20 August 2010
Why a commuter's fare varied
14 August 2010
Tampines pathways designed right, says LTA
10 August 2010
Older MRT stations retrofitted with barrier-free facilities
9 August 2010
We recently started the construction of a covered linkway
28 July 2010
Fare data based on actual trips taken, say transport bodies
28 July 2010
Special lanes are an Olympic tradition, says LTA
17 July 2010
Vehicle owner successfully insured his car
13 July 2010
Commuters should calculate based on weekly transport habits and fares
9 July 2010
Plans to link traffic junction to LRT station
1 July 2010
Fare calculation by the fastest route
29 June 2010
Tap only when leaving bus
22 June 2010
Electronic system makes it easier to detect Off-Peak Car violations
20 June 2010
Senior citizens stand to save with Distance Fares
25 May 2010
Information on Distance Fares are posted on bus stop
25 May 2010
Commuters will have more choices and flexibility
17 May 2010
Uneven road is due to MRT construction work
11 May 2010
Our traffic light system is responsive to changing traffic conditions
3 May 2010
Bayfront Avenue gantry part of existing ERP cordon
1 May 2010
Smoother traffic with road opening
20 April 2010
Taxi firms have a choice for replacements
17 April 2010
Buyers can bid if they want
29 March 2010
Lifts at MRT stations to open soon
24 March 2010
Not safe to have zebra crossings at Punggol Field
9 March 2010
ERP rationale: "If we charged different rates on different roads entering a cordon, motorists would simply switch."
6 March 2010
COE bidding: "The duration was to provide individuals and dealers with sufficient time."
5 March 2010
A role for all in road safety near schools
27 February 2010
ERP gantry location based on overall condition
22 February 2010
Railings at bus stops not practical
22 February 2010
Site check shows lack of space for bridge
20 February 2010
LTA has several traffic feedback channels in place
19 February 2010
Roadwork disruption kept to minimum
13 February 2010
To board, bus stops must be wheelchair-friendly too
3 February 2010
CBD taxi surcharge applies for passengers boarding taxis from York Hotel new exit
26 January 2010
Off-peak cars: What the $100 admin fee is for
22 January 2010
Traffic lights operate in real time
19 January 2010
Minimum value of $3 required when using card to take MRT
11 December 2009
Speed regulating strips reduced number of accidents due to speeding
11 December 2009
Police have stepped up action against errant heavy vehicles drivers
5 December 2009
Multiple avenues to buy e-Day Licence for off-peak cars
2 December 2009
Metal sculpture moved to facilitate upgrading
27 November 2009
No trees have been cut yet
26 November 2009
Speed markings: "We will evaluate."
22 November 2009
90% of commuters satisfied with public transport
16 November 2009
LTA penalises cabbies if picky about fares
12 November 2009
Pasir Ris chosen to represent terminal station for safety doors
5 November 2009
Street lights optimised to suit ambient lighting
4 November 2009
ERP rates dependent of 'basket' of roads: LTA
26 October 2009
LTA says sorry for unpleasant experience
16 October 2009
Senior citizens can extend green man time by up to five seconds using concession cards
5 October 2009
Road safety a shared responsibility, says LTA
12 September 2009
Sharing footpaths: Trial results soon
5 September 2009
Where you can top up Cepas-compliant concession cards
2 September 2009
Half height platform screen doors will not hamper emergency evacuation
6 August 2009
LTA looking into covering walkway
5 August 2009
Highway trouble? "Call our Emas crew."
23 July 2009
Zebra-crossing change depends on number of users
16 July 2009
KPE roads are fine, kerbs are clearly marked
10 July 2009
Underpasses costly
6 July 2009
IU upgrade not mandatory
26 June 2009
Disturbance from KPE tunnel maintenance work will be minimised
26 June 2009
Have you seen the KPE art?
22 June 2009
Land transport system seeks to cater to all
20 June 2009
3 aims of $1m fund
18 May 2009
Car curtains cannot block view
7 May 2009
Please tell LTA where tactile indicators are incorrectly placed
21 April 2009
Expressway plan: Traffic demand a factor
16 April 2009
We will consider feedback
16 April 2009
There are plans to build sheltered walkway
7 April 2009
Staff can dispatch an EMAS service within eight to 15 minutes
23 March 2009
Underpass option being explored
13 March 2009
Food court uses only electricity
6 March 2009
Taxi companies penalised if cabbies breach standards
6 March 2009
Interview is critical part of complaints process
4 March 2009
Circle Line meant to boost connectivity
3 March 2009
New ez-link card: $3 minimum balance easy to remember
3 March 2009
New bridge ramps along Queensway
19 February 2009
Errant cabbies will be punished
14 February 2009
How LTA makes zebra crossings safer
10 February 2009
Traffic flow smoother now on PIE
9 February 2009
ERP shoulder rate smooths traffic flow
6 February 2009
Ez-Link: Why one-tap suggestion won't work
3 February 2009
New ez-link cards: Transition will take 9 months
31 January 2009
Traffic lights not feasible due to high traffic volume
21 January 2009
Why deregistered cars can't be used
19 January 2009
10-year COE period is to ensure system is fair
7 January 2009
Giving way to buses doesn’t compromise road safety
6 January 2009
SMRT, SBS have procedures in place for emergencies
27 December 2008
Top-up patterns shouldn’t differ
19 December 2008
Buses move more people
12 December 2008
Off-peak car, vehicle entry permit schemes have different objectives
8 December 2008
LTA takes care implementing bus lane
2 December 2008
Traffic still flows smoothly on ECP
29 November 2008
MRT seats removed after public feedback
27 November 2008
Thanks, says LTA, praise goes a long way
8 November 2008
Special lane has improved bus speeds
6 November 2008
The LTA has proceeded to construct a drain at the foot of the high ground to carry the excess water away
6 November 2008
Passenger load on trains: What’s acceptable and what’s not
29 October 2008
Pocket bikes can't be used on roads
28 October 2008
LTA’s approach holistic and balanced
21 October 2008
Vehicle growth rate will be reduced
18 October 2008
Taxi fares are set by operators
7 October 2008
Wheelchair dream: Work in progress
30 September 2008
Heavy vehicle summons: Already more than last year
19 September 2008
LTA to step up enforcement
17 September 2008
Ample signs for motorists heading to Thomson Road
11 September 2008
LTA to Keat Hong CCC: Thanks for the thanks
1 September 2008
Exceptions made on case-by-case basis
18 August 2008
Construction of pedestrian crossing is underway
13 August 2008
Roads works: LTA's aim is to minimise inconvenience
7 August 2008
Electronic signs help motorists
30 July 2008
ERP and fare revisions are not linked
28 July 2008
Five hundred trees to be planted after road widening works are completed
27 July 2008
Will try to install taxi stand as soon as possible
26 July 2008
Why Downtown Line differs from earlier ones
24 July 2008
Common-booking number gives taxi-users extra option
19 July 2008
LTA will consider ideas on off-peak cars
18 July 2008
Safety and comfort considered in bike trial
11 July 2008
CNG labels must be displayed on bumpers
8 July 2008
Orbital Circle Line will save travel time
5 July 2008
LTA and URA explain why hotel had to go
28 June 2008
Stringent tests on CNG-converted vehicles
20 June 2008
ERP taxes on usage
20 June 2008
Wheelchair-friendly bus stops by 2010
13 June 2008
But trains cannot be completely silent
9 June 2008
Charge for IU replacement once warranty is over
7 June 2008
ERP: Vehicle usage, not total population
6 June 2008
Customer satisfaction lets us know we are on the right track
3 June 2008
Why LTA needs time to address feedback
28 May 2008
Caught in the glare
26 May 2008
No plans to develop Jurong LRT for now
5 May 2008
CashCard woes: Specific batch to blame
18 April 2008
Vintage cars not for daily use
13 April 2008
Why it's still 60kmh limit for some vehicles
10 April 2008
Developers decide how much space to allot to carparks in new buildings
8 April 2008
Number of parking lots decided by market forces
27 March 2008
LTA stepping up traffic information
24 March 2008
Cycling study only for Tampines
20 March 2008
Soon, ERP rates to be sent by SMS?
14 March 2008
CBD has 4,500 m-cycle parking lots, says LTA
14 March 2008
Better signage for motorists
14 March 2008
LTA replies to feedback about new taxi rule
13 March 2008
LTA is looking into motorcycle parking woes
12 March 2008
Not justifiable to extend Downtown Line to Choa Chu Kang
12 March 2008
Make a living, by all means - but do it safely
11 March 2008
More cabs and better safety at designated taxi stands
10 March 2008
Report those who urinate in public places
3 March 2008
More covered walkways in the pipeline
3 March 2008
No one is above our traffic laws
1 March 2008
It is unfair to pay COE in installments
20 February 2008
No plans to replace metal signage
15 February 2008
LTA replies
9 February 2008
A series of works will be carried out to improve traffic at Serangoon Road
9 February 2008
New ERP ‘not based on time spent on road’
7 February 2008
Reliability of red-light cameras ensured by police
7 February 2008
3 emergency escape routes at Orchard MRT station
17 January 2008
Overhead bridge ready by midyear
15 January 2008
Parf a discount on upfront taxes, hence no cash refund
10 January 2008
New road infrastructure is under constant study
9 January 2008
Why MRT signs are not translated into Malay
21 December 2007
It is the owners who will decide on the lifespan of their cars
10 December 2007
Waiting time of traffic lights at Bedok Ave 4 will be adjusted
8 December 2007
How MRT exit points are decided
7 December 2007
Diesel cars allowed on roads but tax higher
27 November 2007
Tables and chairs not allowed on or close to road
27 November 2007
Faulty air-conditioning system has been fixed
24 November 2007
Driving with defective brake lights can be fined $1000 or jailed for three months
17 November 2007
70kmh speed limit provides safety and smooth traffic flow
17 November 2007
Signs are there to inform motorists of new gantry
16 November 2007
Trials conducted show that countdown timers have reverse effect on motorists
15 November 2007
Trees felled only as a last resort
15 November 2007
Marshals empowered to control traffic after an incident
15 November 2007
In-vehicle unit: No danger if fitted properly
9 November 2007
Prelim work on 'Bt Timah Line' started last year
25 October 2007
Green Link Determining system adjusts timing of green lights
25 October 2007
We will study the feasibility of providing more taxi stands in Tampines
24 October 2007
Use approved fog lamps only when visibility poor
19 October 2007
Traffic lights shut down for modification works initially
18 October 2007
LTA looking out for new technologies capable of controlling street lights
13 October 2007
LTA conducts regular checks for errant cabbies
12 October 2007
Sunrise, sunset...and street lights are timed to go on and off